BLANK Contract No.3 Plan No.12 Arch for the Passage of White Beck under the Embankment across Halton Valley
BLANK Contract No.3 Plan No.9. Contract No. 4 Plan No.6 ... Bridge for Passing the Railway over Public Roads
BLANK [Series of copy drawings relating to Leeds and Selby Railway Contracts. All are pen and ink on tracing paper, some with wash.]
6p on 6 leaves Contract No.3: Specification for the formation and Completion of the part of the Line from the East end of Contract No.1 to the Commencement of Contract No.4 6p on 6 leaves
BLANK Contract No.4 Plan No.9 [Bridges for passing Turnpike, Public & Occupation Roads over the Railway]
BLANK Contract No.1 Plan No.8. Contract No. Plan No.5. Contract No.4 Plan No.5. Contract No.5 Plan No.3
13p on 13 leaves Contract No.1: Specification for the formation and completion of the western part of the line & for the Construction of the Tunnel through Richmond Hill. [Includes Form of Tender and Schedule of Prices]
BLANK [Untitled longitudinal section from 'End of 4th Contract' to 'End of 5th Contract' at the 'New Road from Selby to Bawtry'. In three parts]
BLANK Contract No.3 Plan No.10. Contract No.4 Plan No.8 ... Bridges for Passing Turnpike, Public & Occupation Roads over Railway
4p on 4 leaves Contract No.4: Bridges for Passing Roads over Railway the same as described in Specification No.3 with the following additions ...[and] Contract No.5: 'The ground for the foundations of the several Culverts are to be excavated to the proper level ...' 4p on 4 leaves
BLANK [Untitled longitudinal section from 'End of First Contract' to 'End of 4th Contract'. In six parts] - [Series of ink copy drawings, being longitudinal sections showing embankments and cuttings, roads and water courses crossed etc.]
BLANK Contract No.3 Plan No.11 Arch for the Passage of the Mill Stream under the Embankment across Halton Valley
BLANK Contract No.1 Plan No.12. Contract No.3 Plan No.14. Contract No.4 Plan No.3. Contract No.5 Plan No. 2. Plan of Paving in Horse Tracks
4p on 4 leaves Contract No.2: Specification for Iron work for the formation & Completion of a double Line of Railway from Leeds to Selby a distance of 19 miles and seven furlongs with the necessary passing places & Crossings. [Includes Form of Tender]
BLANK Contract No.3 Plan No.8. Contract No. 4 Plan No.10 Design of Bridge for Passing the Railway over Turnpike Roads
BLANK Contract No.1 Plan No.10. Contract No.3 Plan No.13. Contract No.4 Plan No.7. Contract No.5 Plan No. 5. Section of Crossings
BLANK Contract No.1 Plan No.11. Contract No.2 Plan No.1. Contract No.3 Plan No.3. Contract No.4 Plan No.6. Contract No.5 Plan No.3